Chevrolet Bolt EUV vs Hyundai Veloster N (2022)
Price gap, MSRP + destination
$950
- Bolt EUV: 11.9 cu ft more cargo, 5.0 in more rear legroom.
- Veloster N: $950 cheaper, 75 hp more.
- Bolt EUV wins 5 of 10 measures.
| Measure | Bolt EUV | Veloster N | Winner |
|---|---|---|---|
| MSRP + destination | $34,495 | $33,545 | Veloster N |
| Horsepower | 200 hp | 275 hp | Veloster N |
| Torque | 266 lb-ft | 260 lb-ft | Bolt EUV |
| MPG or MPGe | 115 MPGe | 22 mpg to 25 mpg | N/A |
| Energy cost a year | $600 | N/A | N/A |
| EV range | 247 mi | N/A | N/A |
| Cargo, max | 56.9 cu ft | 45.0 cu ft | Bolt EUV |
| Cargo, seats up | 16.3 cu ft | 20.0 cu ft | Veloster N |
| Rear legroom | 39.1 in | 34.1 in | Bolt EUV |
| Front legroom | 44.2 in | 42.6 in | Bolt EUV |
| Length | 169.5 in | 167.7 in | Not scored |
| Width | 69.7 in | 70.9 in | Not scored |
| Curb weight | 3,680 lb | N/A | N/A |
| Seats | 5 | 4 | Bolt EUV |
| Ground clearance | 5.6 in | 5.3 in | About the same |
| 0-60 mph | 7.0 s estimate | 5.2 s published | Veloster N |
| Basic warranty | 3 yr / 36,000 mi | N/A | N/A |
Not scored: length, width, curb weight. N/A rows are not counted.
Nearest trims by price
| Trim | Nearest in price | Gap |
|---|---|---|
| Bolt EUV LT FWD $33,500 | Veloster N DCT $34,000 | $500 |
| Veloster N FWD $32,500 | Bolt EUV LT FWD $33,500 | $1,000 |
Cost to run
No total: a price or rating is missing.
12,000 miles a year. Gas $3.20. Electricity 17 cents per kWh.
| Cost | Bolt EUV | Veloster N |
|---|---|---|
| MSRP + destination | $34,495 | $33,545 |
| Fuel or charging, 1 year | $600 | N/A |
| Fuel or charging, 6 years | $3,599 | N/A |
| Total, 6 years | $38,094 | N/A |
Which is better for me?
Weight each group from 0 to 10. MPG uses fuel or charging cost.
Equal weights: Veloster N wins.
Bolt EUV wins if Power weight is 3 or less.
| Group | Ahead | By |
|---|---|---|
| Price | Veloster N | 3% |
| MPG | N/A | |
| Power | Veloster N | 27% |
| Space | Bolt EUV | 21% |
| Towing | N/A |
What this cannot tell you
Your price and mpg will differ.
Reliability and safety are not included.
- 2 or more sources
- 1 source
- Model-level, rule or estimate
- Sources disagree